2010 / Design & Construct Contract
Role:
Project Manager
Date:
2010/11
Location:
Somerville, Victoria
Value:
$60M
Employer:
Rebuilding a major local employer
An accelerated rebuild was required to return a processing plant lost to fire in early 2010. With hundreds of local jobs impacted, a seven day per week and at times 24/7 schedule was adopted to restore production some eight months after commencing.
A site based design team was established to coordinate closely with construction activities. A major upgrade to the anerobic treatment pond system and introduction of a reverse osmosis treatment plant were included in the works.
Agile design and construct approach with night shift at critical stages
- New bird unloading, kill floor, boning
room, freezer retention tunnels and
palletising / despatch docks - Process services and fitout
- New anerobic pond system harvesting
gas for water pre-heat - Plant restored to production in 9 months